This update begins with the making of a module.
This piece was actually made by my significant other Heather but I insisted on taking some progress pics as she went.
It started with a cutout for an exposed sewer pipe trench. She added tiles to the flat section of the module.
After adding sand and basecoating.. Voila!!
I started texturing another board quarter. This one with a permanent hill feature.Put down a baseocoat on most of the board. The unpainted section will be getting some garden terrain and I’ll be using caulking for the texture of it.